Survey Date: Tuesday, June 24, 2014
Survey Type: Health
Deficiency: F0281 (Ensure services provided by the nursing facility meet professional standards of quality.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Tuesday, July 22, 2014
The inspection cycle of deficiency: 1 (the deficiency was found on a complaint inspection)
Survey Date: Tuesday, February 11, 2014
Survey Type: Health
Deficiency: F0157 (Immediately tell the resident, the resident's doctor, and a family member of situations (injury/decl)
Scope Severity Code: D
Deficiency Corrected: Past Non-Compliance
Date the deficiency was corrected: Friday, December 6, 2013
The inspection cycle of deficiency: 1 (the deficiency was found on a complaint inspection)
Survey Date: Tuesday, January 7, 2014
Survey Type: Fire Safety
Deficiency: K0062 (Automatic sprinkler systems that have been maintained in working order.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Tuesday, January 28, 2014
The inspection cycle of deficiency: 1 (the deficiency was found on a standard inspection)
Survey Date: Tuesday, January 7, 2014
Survey Type: Fire Safety
Deficiency: K0029 (Special areas constructed so that walls can resist fire for one hour or an approved fire extinguishi)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Tuesday, January 28, 2014
The inspection cycle of deficiency: 1 (the deficiency was found on a standard inspection)
Survey Date: Tuesday, January 7, 2014
Survey Type: Fire Safety
Deficiency: K0018 (Corridor and hallway doors that block smoke.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Tuesday, January 28, 2014
The inspection cycle of deficiency: 1 (the deficiency was found on a standard inspection)
Survey Date: Tuesday, January 7, 2014
Survey Type: Fire Safety
Deficiency: K0147 (Properly installed electrical wiring and equipment.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Tuesday, January 28, 2014
The inspection cycle of deficiency: 1 (the deficiency was found on a standard inspection)
Survey Date: Thursday, December 12, 2013
Survey Type: Health
Deficiency: F0428 (At least once a month, have a licensed pharmacist review each resident's medication (s) and report a)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Monday, January 13, 2014
The inspection cycle of deficiency: 1 (the deficiency was found on a standard inspection)
Survey Date: Thursday, December 12, 2013
Survey Type: Health
Deficiency: F0322 (Give proper treatment to residents with feeding tubes to prevent problems (such as aspiration pneumo)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Monday, January 13, 2014
The inspection cycle of deficiency: 1 (the deficiency was found on a standard inspection)
Survey Date: Thursday, December 12, 2013
Survey Type: Health
Deficiency: F0431 (Maintain drug records and properly mark/label drugs and other similar products according to accepted)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Monday, January 13, 2014
The inspection cycle of deficiency: 1 (the deficiency was found on a standard inspection)
Survey Date: Thursday, December 12, 2013
Survey Type: Health
Deficiency: F0279 (Develop a complete care plan that meets all the resident's needs, with timetables and actions that c)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Monday, January 13, 2014
The inspection cycle of deficiency: 1 (the deficiency was found on a standard inspection)
Survey Date: Wednesday, September 25, 2013
Survey Type: Health
Deficiency: F0157 (Immediately tell the resident, the resident's doctor, and a family member of situations (injury/decl)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Monday, October 14, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a complaint inspection)
Survey Date: Wednesday, September 25, 2013
Survey Type: Health
Deficiency: F0281 (Ensure services provided by the nursing facility meet professional standards of quality.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Monday, October 14, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a complaint inspection)
Survey Date: Wednesday, September 25, 2013
Survey Type: Health
Deficiency: F0279 (Develop a complete care plan that meets all the resident's needs, with timetables and actions that c)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Monday, October 14, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a complaint inspection)
Survey Date: Wednesday, July 24, 2013
Survey Type: Health
Deficiency: F0241 (Provide care for residents in a way that maintains or improves their dignity and respect in full rec)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Thursday, August 15, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a complaint inspection)
Survey Date: Monday, February 4, 2013
Survey Type: Health
Deficiency: F0281 (Ensure services provided by the nursing facility meet professional standards of quality.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Monday, February 25, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a complaint inspection)
Survey Date: Tuesday, January 8, 2013
Survey Type: Fire Safety
Deficiency: K0147 (Properly installed electrical wiring and equipment.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Thursday, January 31, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Tuesday, January 8, 2013
Survey Type: Fire Safety
Deficiency: K0012 (Approved construction type or materials.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Thursday, January 31, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Tuesday, January 8, 2013
Survey Type: Fire Safety
Deficiency: K0050 (Record of quarterly fire drills for each shift under varying conditions.)
Scope Severity Code: C
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Thursday, January 31, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Tuesday, January 8, 2013
Survey Type: Fire Safety
Deficiency: K0144 (Weekly inspections and monthly testing of generators.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Thursday, January 31, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Tuesday, January 8, 2013
Survey Type: Fire Safety
Deficiency: K0064 (Portable fire extinguishers.)
Scope Severity Code: C
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Thursday, January 31, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Tuesday, January 8, 2013
Survey Type: Fire Safety
Deficiency: K0068 (An externally vented heating system.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Thursday, January 31, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Tuesday, January 8, 2013
Survey Type: Fire Safety
Deficiency: K0029 (Special areas constructed so that walls can resist fire for one hour or an approved fire extinguishi)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Thursday, January 31, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Tuesday, January 8, 2013
Survey Type: Fire Safety
Deficiency: K0018 (Corridor and hallway doors that block smoke.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Thursday, January 31, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Tuesday, January 8, 2013
Survey Type: Fire Safety
Deficiency: K0025 (Walls that prevent smoke from passing through and would resist fire for at least one hour.)
Scope Severity Code: E
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Thursday, January 31, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Tuesday, January 8, 2013
Survey Type: Fire Safety
Deficiency: K0062 (Automatic sprinkler systems that have been maintained in working order.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Thursday, January 31, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Tuesday, January 8, 2013
Survey Type: Fire Safety
Deficiency: K0027 (Smoke barrier doors that can resist smoke for at least 20 minutes.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Thursday, January 31, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Thursday, December 20, 2012
Survey Type: Health
Deficiency: F0329 (Ensure that each resident's 1) entire drug/medication regimen is free from unnecessary drugs; and 2))
Scope Severity Code: E
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 1, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Thursday, December 20, 2012
Survey Type: Health
Deficiency: F0281 (Ensure services provided by the nursing facility meet professional standards of quality.)
Scope Severity Code: E
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 1, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Thursday, December 20, 2012
Survey Type: Health
Deficiency: F0514 (Keep accurate, complete and organized clinical records on each resident that meet professional stand)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 1, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Thursday, December 20, 2012
Survey Type: Health
Deficiency: F0279 (Develop a complete care plan that meets all the resident's needs, with timetables and actions that c)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 1, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Thursday, December 20, 2012
Survey Type: Health
Deficiency: F0431 (Maintain drug records and properly mark/label drugs and other similar products according to accepted)
Scope Severity Code: E
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 1, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Thursday, December 20, 2012
Survey Type: Health
Deficiency: F0325 (Ensure residents maintain acceptable nutritional status.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 1, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Thursday, December 20, 2012
Survey Type: Health
Deficiency: F0332 (Keep the rate of medication errors (wrong drug, wrong dose, wrong time) to less than 5%.)
Scope Severity Code: E
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 1, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Thursday, December 20, 2012
Survey Type: Health
Deficiency: F0428 (At least once a month, have a licensed pharmacist review each resident's medication (s) and report a)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 1, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Thursday, December 20, 2012
Survey Type: Health
Deficiency: F0372 (Dispose of garbage and refuse properly.)
Scope Severity Code: C
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 1, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Thursday, December 20, 2012
Survey Type: Health
Deficiency: F0371 (Store, cook, and serve food in a safe and clean way.)
Scope Severity Code: F
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 1, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Thursday, December 20, 2012
Survey Type: Health
Deficiency: F0441 (Have a program that investigates, controls and keeps infection from spreading.)
Scope Severity Code: E
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 1, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Thursday, December 20, 2012
Survey Type: Health
Deficiency: F0425 (Provide routine and emergency drugs through a licensed pharmacist and only under the general supervi)
Scope Severity Code: E
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 1, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Thursday, December 20, 2012
Survey Type: Health
Deficiency: F0456 (Keep all essential equipment working safely.)
Scope Severity Code: C
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 1, 2013
The inspection cycle of deficiency: 2 (the deficiency was found on a standard inspection)
Survey Date: Tuesday, August 28, 2012
Survey Type: Health
Deficiency: F0155 (Let residents refuse treatment, refuse to take part in an experiment, or formulate advance directive)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Tuesday, October 9, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a complaint inspection)
Survey Date: Thursday, January 12, 2012
Survey Type: Fire Safety
Deficiency: K0067 (Heating and ventilation systems that have been properly installed according to the manufacturer's in)
Scope Severity Code: F
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Monday, February 6, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Thursday, January 12, 2012
Survey Type: Fire Safety
Deficiency: K0073 (Restrictions on the use of highly flammable decorations.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Monday, February 6, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Thursday, January 12, 2012
Survey Type: Fire Safety
Deficiency: K0147 (Properly installed electrical wiring and equipment.)
Scope Severity Code: E
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Monday, February 6, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Thursday, January 12, 2012
Survey Type: Fire Safety
Deficiency: K0018 (Corridor and hallway doors that block smoke.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Monday, February 6, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Thursday, January 12, 2012
Survey Type: Fire Safety
Deficiency: K0064 (Portable fire extinguishers.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Monday, February 6, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Thursday, January 12, 2012
Survey Type: Fire Safety
Deficiency: K0050 (Record of quarterly fire drills for each shift under varying conditions.)
Scope Severity Code: E
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Monday, February 6, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Thursday, January 12, 2012
Survey Type: Fire Safety
Deficiency: K0144 (Weekly inspections and monthly testing of generators.)
Scope Severity Code: E
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Monday, February 6, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Thursday, January 12, 2012
Survey Type: Fire Safety
Deficiency: K0062 (Automatic sprinkler systems that have been maintained in working order.)
Scope Severity Code: E
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Monday, February 6, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Thursday, January 12, 2012
Survey Type: Fire Safety
Deficiency: K0066 (Posted "No-smoking" signs in areas where smoking is not permitted or ashtrays provided where smoking)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Monday, February 6, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Thursday, January 12, 2012
Survey Type: Fire Safety
Deficiency: K0012 (Approved construction type or materials.)
Scope Severity Code: E
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Monday, February 6, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Friday, January 6, 2012
Survey Type: Health
Deficiency: F0428 (At least once a month, have a licensed pharmacist review each resident's medication (s) and report a)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 3, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Friday, January 6, 2012
Survey Type: Health
Deficiency: F0176 (Allow residents to self-administer drugs if determined safe.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 3, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Friday, January 6, 2012
Survey Type: Health
Deficiency: F0156 (Give residents a notice of rights, rules, services and charges.)
Scope Severity Code: B
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 3, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Friday, January 6, 2012
Survey Type: Health
Deficiency: F0431 (Maintain drug records and properly mark/label drugs and other similar products according to accepted)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 3, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Friday, January 6, 2012
Survey Type: Health
Deficiency: F0371 (Store, cook, and serve food in a safe and clean way.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 3, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Friday, January 6, 2012
Survey Type: Health
Deficiency: F0281 (Ensure services provided by the nursing facility meet professional standards of quality.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 3, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Friday, January 6, 2012
Survey Type: Health
Deficiency: F0425 (Provide routine and emergency drugs through a licensed pharmacist and only under the general supervi)
Scope Severity Code: E
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 3, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Friday, January 6, 2012
Survey Type: Health
Deficiency: F0241 (Provide care for residents in a way that maintains or improves their dignity and respect in full rec)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 3, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Friday, January 6, 2012
Survey Type: Health
Deficiency: F0441 (Have a program that investigates, controls and keeps infection from spreading.)
Scope Severity Code: F
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 3, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Friday, January 6, 2012
Survey Type: Health
Deficiency: F0253 (Provide housekeeping and maintenance services.)
Scope Severity Code: D
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Friday, February 3, 2012
The inspection cycle of deficiency: 3 (the deficiency was found on a standard inspection)
Survey Date: Thursday, December 29, 2011
Survey Type: Health
Deficiency: F0329 (Ensure that each resident's 1) entire drug/medication regimen is free from unnecessary drugs; and 2))
Scope Severity Code: G
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Thursday, April 4, 2013
The inspection cycle of deficiency: 3 (the deficiency was found on a complaint inspection)
Survey Date: Thursday, December 29, 2011
Survey Type: Health
Deficiency: F0279 (Develop a complete care plan that meets all the resident's needs, with timetables and actions that c)
Scope Severity Code: G
Deficiency Corrected: Deficient, Provider Has Date Of Correction
Date the deficiency was corrected: Thursday, April 4, 2013
The inspection cycle of deficiency: 3 (the deficiency was found on a complaint inspection)